Imperial Town construction site

Construction progress

Every month, we publish photo reports and progress updates so that you can easily follow every stage of the complex’s construction and be confident that the schedule is being adhered to.

Project Specifications

Engineering and technical solutions that ensure the reliability, warmth and comfort of your home.

Walls and quality
50 cm thick red brick (2 bricks) for high sound and thermal insulation.
Foundations and floor slabs
A monolithic foundation slab and reinforced concrete floor slabs.
Facade and insulation
Combined insulation (100 mm mineral wool + expanded polystyrene), finished with clinker tiles, porcelain stoneware and ‘baranchik’ plaster.
Energy-efficient windows
A five-chamber Rehau profile (70 mm) with a double-glazed, energy-saving unit.
Reliable front doors
A Ukrainian-made metal door (80 kg) with MDF panels and Kale fittings.
Heating and utilities
A dual-circuit gas boiler, radiators, electricity connected (5 kW) and underfloor heating installed in the kitchen, with a loop leading to the bathroom.
Battery power
A hybrid system (solar panels, batteries and a generator) to power lifts, water, the internet and lighting during power cuts.
Modern lifts
Otis high-speed lifts with a load capacity of 630 kg (for 8 people).
Design of building entrances
Large-format porcelain stoneware, a Grilyato ceiling and well-appointed waiting areas with sofas and greenery.
Shelter in the house
A safe space covering 320 m² with internet access, a kitchen, toilets, a first-aid post and areas for relaxation.
Privacy and security
A car-free courtyard, a gated compound, CCTV and access via Face ID or key cards.
Sport and leisure
Urban Mankens play areas, an indoor football pitch, a tennis court and lounge areas.

0%

Legal
construction

Project
documents

Key project documents to verify legal transparency, permit information and construction reliability.

Land plot document

Available

Construction permit

Available

Technical conditions

Available

123

Available

  1. № 01Preparatory work and the foundations
  2. № 02Assembling the box
  3. № 03Enclosure and facade
  4. № 04Utilities and internal works
  5. № 05Landscaping and handover of keys
Preparatory work and the foundations
Assembling the box
Enclosure and facade
Utilities and internal works
Landscaping and handover of keys

Preparatory work and the foundations

Start

Site clearance, excavation, pile driving, construction of a monolithic foundation slab, waterproofing and the underground section of the building.

Assembling the box

Step 02

Erection of load-bearing structures, bricklaying of double-layered red-brick walls, installation of floor slabs, staircases and the roof.

Enclosure and facade

Step 03

Installation of Rehau energy-efficient windows and doors, combined wall insulation, and finishing of the façade with clinker bricks and porcelain stoneware.

Utilities and internal works

Step 04

Connection of utilities, installation of Otis lifts, plastering of walls, final screed, installation of underfloor heating and designer finishes in the entrance halls.

Landscaping and handover of keys

Finish

Landscaping of the enclosed courtyard, children’s play areas and sports grounds; planting of greenery; commissioning of the building; and handover of the keys to the owners.