Block construction

Будинок 2 Block 2

This section gathers the key works, photos and a brief monthly progress summary, so you can quickly assess the construction dynamics.

Under construction

Scheduled for:10 November, 2027

1stage

Under construction

Foundation and groundwork

Site preparation and construction of the building’s monolithic foundation.

Earthworks

Clearing the site, excavating soil and preparing the foundation pit.

Foundation slab

Installation of piles and pouring of a monolithic slab to ensure maximum strength.

Waterproofing and pipework

Double-layer protection against moisture and the laying of underground utility lines.

The underground section

Construction of monolithic walls for the ground floor and a safe shelter.